Back

Trimetal Contact Rivets

A three-part contact rivet for designs that need a contact layer on more than one face or at the shank end.

Part details

Type
Trimetal Contact Rivets
Materials
Silver-alloy / copper-based three-part material systems
Applications
Relays, switches, contactors, circuit breakers
Reference size
Type A/B indicative ranges; confirm final dimensions by drawing or sample

Sampling & supply

Sample development
Available after technical review
Production MOQ
Confirmed by part, material, tooling and production arrangement; sample and trial quantities assessed separately
Sample lead time
Typically 5-10 working days after technical review and agreed start conditions
Production lead time
Typically 15-20 days after technical review and agreed start conditions

Construction and supply options.

01

Understand the layer arrangement

Use the available part and application information to clarify where each contact layer is needed.

02

Plan the material system

Define the contact layer, intermediate material, and base for the intended assembly.

03

Bring material and geometry together

Consider material use, geometry, tooling, and forming as one manufacturing process.

04

Confirm the production plan

Agree the production specification and any sample or process validation needed before mass production.

Type A and Type B dimensions

Type A and Type B use different layer arrangements, so their dimensions are listed separately.

Swipe the table horizontally to see all columns.

Trimetal Type A and Type B dimensions
TypeD (mm)T (mm)S1 (mm)S2 (mm)d (mm)L (mm)SR (mm)Draft angle
A13.5–4.00.8–1.10.35–0.500.30–0.502.01.5–2.56–1211°
A24.0–5.00.9–1.30.40–0.700.8–1.02.51.5–3.58–1511°
B12.5–3.50.4–0.90.20–0.350.30–0.501.8–2.20.8–1.56–1213°
B23.0–4.00.6–1.10.25–0.500.30–0.602.4–2.70.9–1.88–1513°
B34.0–4.50.7–1.20.30–0.550.30–0.602.9–3.21.0–2.010–2013°
B44.5–5.50.8–1.50.30–0.600.40–0.703.5–4.51.5–2.510–3013°

Reference dimensions only. Final dimensions and tolerances are confirmed from the drawing or sample, material system, and project review.

Manufacturing & Inspection

Manufacturing

Layer arrangement, material selection, geometry, tooling, and process feasibility are considered together before sampling.

  • Three-part layer arrangement for the required contact faces
  • Material and geometry review before production sampling
  • Forming route selected for the approved type A or type B structure
  • Finished surface condition selected for the part and application

Inspection

Inspection follows the required layer position and approved specification.

  • Key dimensions and visual condition
  • Head and foot silver-layer assessment where specified
  • Trimetal bonding condition where specified
  • Sample-to-production consistency against the approved sample and specification

Understand the Structure and Key Features

Trimetal · one arrangement

Contact material is placed at the head and at an additional working end.

  1. Contact layer at the head
  2. Copper-based intermediate and shank
  3. Additional contact layer at the shank end
Trimetal · one arrangementContact material is placed at the head and at an additional working end. Contact layer at the head; Copper-based intermediate and shank; Additional contact layer at the shank end123

Compare the contact material, conductive support and joining method.

Sample and quote

Provide the layer arrangement, geometry, drawing, or sample so we can define the material and forming route. Include the drawing or sample reference, expected quantity, and required timing. With sufficient drawings or specifications, we can prepare a quotation before sampling. Any sample or process validation required for the project is agreed and completed before mass production.

Discuss Your Part